EMCMUD 3 Update – Water Plant Engineering
May 5, 2022The Board of Directors of East Montgomery County Municipal Utility District No. 3 (EMCMUD 3) want to update residents regarding engineering efforts relating to Water Plant 1 and Water Plant 2.
In addition to the efforts by the District Operator, TNG Utility, to identify and address the water quality concerns from Water Plant 1, the Board has tasked the District Engineer, J.A. Costanza & Assoc. Engineering, Inc., to move forward with improvements to both plants in an effort to increase efficiency and improve capacity.
These improvements are a phased approach that will include:
- Upgrades to the booster pumps and pressure tanks at both water plants
- Water quality study at both wells to determine well stability and integrity
- Review the potential of adding polyphosphates to the system to suspend and mitigate particulates in the water
These engineering reviews and updates should assist the operator in addressing the current concerns, but also help the District provide water more efficiently to residents within the community.
Your neighbors might not know this information! Share this to social media using the share links above. You can link it directly to Facebook or Twitter, or click the copy link button to share to Nextdoor!